ELECTRICAL PROJECTS / EV INFRASTRUCTURE

    Plan EV charging around the building you have.

    A sensible installation starts with the site: the electrical supply, parking layout, expected demand and how drivers will access chargers. We help scope the checks and practical next steps before work is proposed.

    How it works
    Clear scope before work Practical next steps Milton Keynes & surrounding areas
    Scope agreed firstUnderstand the premises and need
    Useful recordsFindings you can review and act on
    Work arranged clearlyDiscuss the next steps without pressure

    SITE FIRST. CHARGER SECOND.

    The right setup is specific to your premises.

    Commercial EV charging projects begin with understanding the existing electrical installation and how the site operates. A survey can review the available supply and distribution, proposed charger locations, cable routes, parking arrangements and likely charging demand.

    Electrical capacity and simultaneous demand need careful consideration. Depending on the site, options may include load management, phased installation or supply upgrades. The distribution network operator (DNO) may need to be consulted or notified depending on the proposed installation and connection requirements; this is assessed for the project rather than assumed.

    Planning also includes the user experience and future operation: who can charge, how bays are managed, connectivity and back-office requirements, accessibility, signage and maintenance. Installation specification and any building or planning considerations should be confirmed against the site and current requirements before work is committed.

    WHAT WE CONSIDER

    A clear scope, shaped around the site.

    Every premises is different. These are the kinds of details that help establish what is useful, relevant and practical for your building.

    01 / SITE DETAIL

    Existing supply

    Incoming capacity, distribution boards, spare ways, cable routes and the condition of relevant parts of the electrical installation.

    02 / SITE DETAIL

    Demand and load

    How many vehicles may charge, when they are on site, expected charging behaviour and whether load management is appropriate.

    03 / SITE DETAIL

    DNO and connection

    Whether the proposed connection or capacity changes require DNO engagement, notification or other network checks.

    04 / SITE DETAIL

    Parking and access

    Bay layout, cable reach, protection from vehicle impact, accessibility, signage and day-to-day traffic flow.

    05 / SITE DETAIL

    Operations and billing

    Access control, user groups, charging management, connectivity and how the client wants charging to be administered.

    06 / SITE DETAIL

    Phasing and future demand

    Whether an initial installation should allow for additional charge points as vehicle use and site needs develop.

    FROM ENQUIRY TO NEXT STEP

    Know what happens before you commit.

    We start by understanding the premises and agree what is in scope. The detail and timing are confirmed with you before any work is arranged.

    STEP 01

    Share the brief

    Tell us about the site, parking, user groups, desired charger numbers and any project constraints.

    STEP 02

    Survey and assess

    Review relevant electrical infrastructure, locations, routes and likely load and connection considerations.

    STEP 03

    Confirm the approach

    Discuss options and any further design, DNO, permission or operational checks needed for the proposal.

    STEP 04

    Agree installation scope

    Work proceeds only once the design, responsibilities, requirements and proposed scope are understood.

    GOOD TO KNOW

    Questions, answered plainly.

    Need to clarify your particular property or existing records? Send us the context and we can discuss what to establish first.

    Can you tell from a phone call how many chargers my site can support?

    Not reliably. The available capacity and practical number of charge points depend on the electrical installation, usage profile and proposed equipment. A site survey and, where needed, further design or network checks are required before confirming a solution.

    Will my project need DNO approval or a supply upgrade?

    It depends on the installation and network connection. The DNO may need to be consulted or notified, and a supply upgrade may or may not be required. These points are assessed against the actual site and proposed load; they cannot be assumed in advance.

    Can load management avoid a supply upgrade?

    Load management can help control demand by balancing charging against available capacity, but whether it is suitable or sufficient depends on the site, equipment and charging requirements. It should be considered during project design, not treated as a guaranteed substitute for network capacity.

    Do you install chargers at workplaces and commercial premises?

    We can discuss commercial and workplace sites, including staff, fleet or visitor use. The feasible scope depends on access, parking, electrical infrastructure and any site-specific requirements.

    Is ProConform OZEV-approved?

    We do not claim OZEV approval on this page. Any grant or scheme eligibility depends on current programme rules and the specific installer, product and project. Check the relevant official scheme requirements before relying on grant support.

    A STRAIGHTFORWARD NEXT STEP

    Tell us what the building needs.

    Share the basics and the ProConform team can come back to discuss scope, records and a practical way forward. No instant quote selector and no obligation to proceed.

    Prefer to talk? 0333 577 2033

    Request a conversation

    Fields marked * are required.

    ENQUIRY / 01
    Service
    EV Charging Installation
    Your information is sent to the ProConform team.

    For urgent requirements, call 0333 577 2033. Submitting this form does not appoint a contractor or confirm a booking.

    Important: EV project feasibility, permissions, network requirements and final design depend on the site and current requirements. An enquiry or survey does not guarantee capacity, DNO acceptance, funding eligibility or a particular installation outcome.