Existing supply
Incoming capacity, distribution boards, spare ways, cable routes and the condition of relevant parts of the electrical installation.
ELECTRICAL PROJECTS / EV INFRASTRUCTURE
A sensible installation starts with the site: the electrical supply, parking layout, expected demand and how drivers will access chargers. We help scope the checks and practical next steps before work is proposed.
SITE FIRST. CHARGER SECOND.
Commercial EV charging projects begin with understanding the existing electrical installation and how the site operates. A survey can review the available supply and distribution, proposed charger locations, cable routes, parking arrangements and likely charging demand.
Electrical capacity and simultaneous demand need careful consideration. Depending on the site, options may include load management, phased installation or supply upgrades. The distribution network operator (DNO) may need to be consulted or notified depending on the proposed installation and connection requirements; this is assessed for the project rather than assumed.
Planning also includes the user experience and future operation: who can charge, how bays are managed, connectivity and back-office requirements, accessibility, signage and maintenance. Installation specification and any building or planning considerations should be confirmed against the site and current requirements before work is committed.
WHAT WE CONSIDER
Every premises is different. These are the kinds of details that help establish what is useful, relevant and practical for your building.
Incoming capacity, distribution boards, spare ways, cable routes and the condition of relevant parts of the electrical installation.
How many vehicles may charge, when they are on site, expected charging behaviour and whether load management is appropriate.
Whether the proposed connection or capacity changes require DNO engagement, notification or other network checks.
Bay layout, cable reach, protection from vehicle impact, accessibility, signage and day-to-day traffic flow.
Access control, user groups, charging management, connectivity and how the client wants charging to be administered.
Whether an initial installation should allow for additional charge points as vehicle use and site needs develop.
FROM ENQUIRY TO NEXT STEP
We start by understanding the premises and agree what is in scope. The detail and timing are confirmed with you before any work is arranged.
Tell us about the site, parking, user groups, desired charger numbers and any project constraints.
Review relevant electrical infrastructure, locations, routes and likely load and connection considerations.
Discuss options and any further design, DNO, permission or operational checks needed for the proposal.
Work proceeds only once the design, responsibilities, requirements and proposed scope are understood.
GOOD TO KNOW
Need to clarify your particular property or existing records? Send us the context and we can discuss what to establish first.
Not reliably. The available capacity and practical number of charge points depend on the electrical installation, usage profile and proposed equipment. A site survey and, where needed, further design or network checks are required before confirming a solution.
It depends on the installation and network connection. The DNO may need to be consulted or notified, and a supply upgrade may or may not be required. These points are assessed against the actual site and proposed load; they cannot be assumed in advance.
Load management can help control demand by balancing charging against available capacity, but whether it is suitable or sufficient depends on the site, equipment and charging requirements. It should be considered during project design, not treated as a guaranteed substitute for network capacity.
We can discuss commercial and workplace sites, including staff, fleet or visitor use. The feasible scope depends on access, parking, electrical infrastructure and any site-specific requirements.
We do not claim OZEV approval on this page. Any grant or scheme eligibility depends on current programme rules and the specific installer, product and project. Check the relevant official scheme requirements before relying on grant support.
A STRAIGHTFORWARD NEXT STEP
Share the basics and the ProConform team can come back to discuss scope, records and a practical way forward. No instant quote selector and no obligation to proceed.
Prefer to talk? 0333 577 2033Fields marked * are required.
Important: EV project feasibility, permissions, network requirements and final design depend on the site and current requirements. An enquiry or survey does not guarantee capacity, DNO acceptance, funding eligibility or a particular installation outcome.