Remedial works and repairs

    Failed a Compliance Inspection? Get a Remedial Quote

    Upload an EICR, fire alarm or emergency lighting report. We review the listed defects and quote the work that can be scoped. More information or a site survey may be needed.

    An estimate is not a confirmed final price. We’ll explain if the report needs further review.

    Remedial work following three types of inspection

    Upload the report you already have. We’ll assess the findings relevant to that system and clarify anything that cannot be reliably priced from the document alone.

    EICR remedial works

    If an EICR is unsatisfactory, upload it for review of the observations and a quotation for the identified work.

    • C1 and C2 observations
    • Further investigation (FI) requirements
    • Electrical repairs and corrective work

    Fire alarm remedial works

    Upload the inspection report for review of the listed faults and corrective work that may be required.

    • Fire alarm inspection defects
    • Device, component, battery or power-supply faults
    • Non-compliances requiring corrective work

    How the remedial quotation process works

    You can submit a report from another inspection provider. The report helps us understand the findings before we quote.

    1. 1

      Upload your existing report

      Submit an EICR, fire alarm or emergency lighting report, including one issued by another contractor.

    2. 2

      We review the findings

      The report is classified and its findings are assessed. Straightforward scopes may receive an estimate; uncertain or incomplete submissions are referred for manual review.

    3. 3

      Confirm the quotation and access

      We may ask for missing information, photographs or a site survey before confirming a firm quotation. If you accept, we agree the work scope, access and attendance arrangements with you.

    4. 4

      Complete and verify agreed work

      Remedial work is handled in-house wherever possible. After completion, relevant testing and completion records are provided where applicable to the work.

    When the report needs more review

    Some reports do not contain enough detail to identify a reliable scope or price. If that happens, we’ll review the submission and may ask for missing pages, photographs or other information, or arrange a site survey before providing a firm quotation.

    Attendance, repairs and records

    If you accept the quotation, we’ll agree the work, access and attendance arrangements with you. Remedial work is handled in-house wherever possible; if another contractor is needed, we’ll discuss the arrangement before you proceed. Relevant testing and completion records are provided where applicable to the work.

    Have an inspection report with defects?

    Upload it to start a remedial works estimate. If you’d rather discuss a complex case with the team, you can also send a manual request.

    No final price is promised until the scope has been reviewed.